Brand Name: | Lantiden |
Model Number: | LNSA009 |
MOQ: | 100 barrels |
Price: | Negotiable |
Delivery Time: | 3-7 days |
Payment Terms: | T/T,L/C |
Social Space Formaldehyde purification performance 85% moisture proof Interior wall paints
Product Introduction
This product is made of high-quality diatomaceous earth raw materials and refined with organic modified inorganic mineral gelling materials. It has the characteristics of green environmental protection, easy to put on the wall, and easy to construct. The product has strong adsorption performance for harmful substances such as formaldehyde, benzene, and ammonia. At the same time, it has a certain purification effect on odor and second-hand smoke in the home space.
Product Features
1. Purify formaldehyde, formaldehyde purification performance ≥ 85%. .
2. Moisture absorption and moisture resistance, reduce the phenomenon of water droplets hanging on the wall during the return of the south day, and create a comfortable living environment
3. Antibacterial and mildew-proof, inhibit the phenomenon of mold growth on the wall due to moisture.
4. Odor-free and environmentally friendly: no irritating odor, does not contain formaldehyde, benzene, heavy metals and other harmful substances.
5. Rich colors, 1190 color schemes.
6. Simple construction: no need to mix, can be directly applied to the wall.
Specification
Theoretical dosage: about 4-5㎡/KG/2 times, the actual consumption varies depending on the construction method and the flatness of the base.
Dilution ratio: according to the actual situation, no more than 10% of clean water can be added for dilution.
Drying time: about 2 hours for surface drying; recoating time is at least 2 hours (25℃, 50% relative humidity), and it can be extended moderately at low temperature.
Maintenance time: 7 days/25℃, which can be extended at low temperature (not less than 5℃) to obtain the ideal coating effect.
Implementation standards: GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings", GB/T9756-2018 "Synthetic Resin Emulsion Interior Wall Coatings" first-class products.
Product specifications: 10KG/barrel, 20KG/barrel.
Shelf life: see product label.
Application
Suitable for interior wall surface decoration of various buildings such as high-end residential buildings, apartments, hotels, office buildings, hospitals, schools, shopping malls, etc.
Usage method
Construction method: rolling, spraying, brushing, etc.
Construction tools: material tray, palette knife, masking paper, short-hair roller, brus
water-based spray gun, etc.
Construction process: ①On the putty layer, roll-coat one coat of anti-alkali sealing primer and wait for it to dry;
②Roll-coat the first coat of water-based diatom paint in the reception space and wait for it to dry;
During construction, the corners of the wall must be painted first. When the corners are not completely dry, a large area of rolling is carried out. It is advisable to apply the slurry evenly to the wall from the upper part to the lower part of the wall, from left to right, from inside to outside, from easy to difficult, and use a roller or spray gun to apply the slurry evenly to the wall. The force should be uniform and no coating should be missed; the brushing speed should be consistent and the force should be uniform to ensure uniform coating. When rolling, it is strictly forbidden to squeeze the roller when the roller does not absorb much material; when brushing, the number of back and forth brushing should not be too many to prevent bubbling or leaving brush marks; normal rolling construction must be rolled and collected. When recycling, the roller must be collected in the same direction, and it is strictly forbidden to roll back and forth; rollers without dead angles should be selected for rolling construction. Try to stay close to the edge during construction; special areas such as corners, skirtings, and gypsum ceilings can be repaired with a brush for details.
③Roll the second coat of water-based diatom paint for the reception space.
Construction environment: It is not suitable to apply when the temperature is below 5℃ or the relative humidity is above 80%.
Base treatment: Clean the surface of the base to be painted before construction to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new base surfaces such as ash sand, plaster, cement, etc. (pH value is less than 10, moisture content is less than 10%) should be dried before construction.
During construction, please configure necessary protective and labor protection supplies such as protective glasses, gloves and professional construction clothes according to local operating specifications.
Before construction, it should be fully stirred and used in a certain proportion. The preparation container must be clean and free of other chemical substances and debris.
Please use clean water to clean the utensils in time during and after construction.
Precautions
If the product leaks, cover it with sand or soil for absorption.
For the treatment of pollutants after absorption, including cans and unused containers, they should be handled in accordance with local environmental protection standards.
Do not discharge discarded paint waste into drains or water sources.
If this product accidentally gets into your eyes when using it, please rinse with clean water in time. If you feel uncomfortable, please seek medical attention in time.