Good price  online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Texture Wall Paint
Created with Pixso. 20kg Textured Wall Paint Microcrystalline Stone Stain Resistant Rub Resistant

20kg Textured Wall Paint Microcrystalline Stone Stain Resistant Rub Resistant

Brand Name: Lantiden
Model Number: LNYA015
MOQ: 100 barrels
Price: Negotiable
Delivery Time: 3 - 7 days
Payment Terms: T/T, L/C
Detail Information
Place of Origin:
China
Certification:
EPA、CCC、DOT、EEC、CE
Durability:
Long-lasting
Suitable Surfaces:
Plaster, Concrete, Brick
Voc Content:
Low
Application Method:
Brush, Roller,spray
Color Options:
Over 1000 Colors Available
Resistance:
Mildew And Algae
Color Options:
Customized Color Available
Name:
Textured Wall Paint
Packaging Details:
plastic barrels, carton, wooden pallet
Supply Ability:
100,000 tons/year
Highlight:

20kg Textured Wall Paint

,

Textured Wall Paint Stain Resistant

,

Textured Wall Paint Rub Resistant

Product Description

20kg Texture Wall Paint Microcrystalline stone simple and elegant, luxurious Stain-resistant and rub-resistant Wall decoration indoor wall

 

Product Introduction

Microcrystalline stone is a low-key and restrained diatom art paint that combines simple construction and texture. It not only has a micro-cement texture effect, but also has a short construction period. It can easily create a simple but textured wall effect, creating a transparent and high-end

atmosphere.

 

Product Features

1. Efficient decomposition of formaldehyde (formaldehyde purification performance ≥ 90%)

2. Release negative oxygen ions (continued release of 1000-2000/cm³)

3. Smoking deodorization

4. Moisture absorption and moisture resistance

5. Antibacterial and mildew-proof (I-level antibacterial, 0-level mildew-proof)


Technical parameters

 Theoretical dosage: Depending on the specific process, it is about 0.6-0.8㎡/KG/finished product. The actual construction area will vary due to different personal construction techniques and processes.

 Dilution ratio: It is not recommended to add water. A small amount can be added in summer according to actual conditions.

 Drying time: Depending on the actual construction process, the drying time varies.
Maintenance time: 7 days/25℃, low temperature (not less than 5℃) can be extended to obtain the ideal coating effect.
Implementation standard: minimalist, natural sand surface effect, with matte luster and delicate and smooth texture, simple and elegant, light luxury and restrained.
Product specifications: 20KG/barrel.
Shelf life: see product label.

 

Usage method

Construction method: scraping, etc.
Construction tools: material tray, palette knife, masking paper, short-hair roller, brush, scraper, etc.
Construction process: ①On the putty layer, roll 1 coat of penetration sealing primer and wait for it to dry thoroughly;
②Roll 1 coat of Imosha S primer and wait for it to dry thoroughly;
The primer needs to be adjusted to the same color (same color as the topcoat), and the materials need to be mixed evenly. When constructing, it is advisable to apply the slurry evenly on the wall from the upper part to the lower part, from left to right, from inside to outside, from easy to difficult, and use a roller or spray gun to evenly apply the slurry to the wall. The force should be uniform and no leakage should be applied; after the primer is completed, the wall needs to be patched, and the primer must be applied after the patch is polished and smoothed; after the primer is rolled over a large area, the corners of the wall must be painted in place, and the coating surface must be allowed to dry, dry to the touch, and not sticky to the finger before the topcoat can be applied.
③Roll 2 coat of Imosha S primer and wait for it to dry thoroughly;
④Scrape 1 coat of microcrystalline stone and wait for it to dry thoroughly;
⑤Scrape 2 coat of microcrystalline stone ⑥Roll 1 coat of inorganic diamond cover topcoat.
Construction environment: It is not suitable to construct when the temperature is lower than 5℃ or the relative humidity is above 80%.
Base treatment: Before construction, clean the surface of the base to be painted to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new base surfaces such as ash sand, plaster, cement, etc. (pH value is lower than 10, moisture content is lower than 10%) should be dried before construction.
During construction, please configure necessary protective and labor protection supplies such as protective glasses, gloves and professional construction clothes according to local operating specifications.
Before construction, stir well and use in a certain proportion. The preparation container must be clean and free of other chemical substances.
Please use clean water to clean the equipment in time during and after construction.

 

Constructability No obstacles in applying two coats
VOC Below the detection limit
Formaldehyde content Below the detection limit
Total content of benzene series Below the detection limit
Total lead (Pb) content Below the detection limit
Soluble heavy metal content Below the detection limit
Pigment Lead-free pigment
Solvent type Water-based
Theoretical coverage 0.6-0.8㎡/1KG/2 times
Dilution ratio Do not dilute with water.
Drying time Surface drying time ≤6h
Maintenance time 7 days/25℃, extended at low temperatue (not less than 5℃)
Implementation standard GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings"
Product specification 20KG/barrel
Shelf life 24 months