Good price  online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Texture Wall Paint
Created with Pixso. Environmentally Friendly Interior Paint Silver Golden Blue Purple Green Metallic Pearlescent Texture

Environmentally Friendly Interior Paint Silver Golden Blue Purple Green Metallic Pearlescent Texture

Brand Name: Lantiden
Model Number: LNYA004
MOQ: 100 barrels
Price: Negotiable
Delivery Time: 3 - 7 days
Payment Terms: T/T,L/C
Detail Information
Place of Origin:
China
Certification:
EPA、CCC、DOT、EEC、CE
Durability:
Long-lasting
Suitable Surfaces:
Plaster, Concrete, Brick
Voc Content:
Low
Application Method:
Brush, Roller,spray
Color Options:
Customized Color Available
Resistance:
Mildew And Algae
Name:
Textured Wall Paint
Packaging Details:
plastic barrels, carton, wooden pallet
Supply Ability:
100,000 tons/year
Highlight:

Environmentally Friendly Interior Paint

,

Pearlescent Eco Friendly Interior Paint

,

Metallic Pearlescent Texture Paint

Product Description

Texture paints Pearlescent silver golden blue purple green etallic pearlescent texture Interior Wall Paint


Product Features

1. Efficient decomposition of formaldehyde (formaldehyde purification performance ≥ 90%)

2. Release of negative oxygen ions (continuous release of 1000-2000/cm³)

3. Smoking deodorization

4. Moisture absorption and moisture resistance

5. Antibacterial and mildew-proof (I-level antibacterial, 0-level mildew-proof)

6. Stain-resistant and rub-resistant (I-level stain-resistant, washable times ≥ 6000)

7. Odor-free and environmentally friendly

8. Artistic texture: metallic pearlescent texture, colorful and colorful fantasy effect, colorful and comfortable touch.


Product Use

 Theoretical dosage: Depending on the specific process, it is about 6-30㎡/1KG/finished product. The actual construction area will vary due to different personal construction methods and processes.

 Dilution ratio: 20%-30% of clean water can be used for dilution, and the amount of water added is based on the process requirements.
 Drying time: Depending on the actual construction process, the drying time varies.
 Maintenance time: 7 days/25℃, low temperature (not less than 5℃) can be extended to obtain the ideal coating effect.
 Implementation standards: GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings", GB/T9756-2018 "Synthetic Resin Emulsion Interior Wall Coatings" superior products.
 Product specifications: 5KG/barrel.
 Shelf life: See product label.



Application

Suitable for special effect decoration of indoor walls of various buildings such as high-end residences, villas, hotels, clubs, venues, office buildings, public areas, etc.



Technical Parameters 

 Theoretical dosage: Depending on the specific process, it is about 6-30㎡/1KG/finished product. The actual construction area will vary due to different personal construction methods and processes.

 Dilution ratio: 20%-30% of clean water can be used for dilution, and the amount of water added is based on the process requirements.
 Drying time: Depending on the actual construction process, the drying time varies.
 Maintenance time: 7 days/25℃, low temperature (not less than 5℃) can be extended to obtain the ideal coating effect.
 Implementation standards: GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings", GB/T9756-2018 "Synthetic Resin Emulsion Interior Wall Coatings" superior products.
 Product specifications: 5KG/barrel.
 Shelf life: See product label.


Usage method

 Construction method: rolling, spot coating, etc.
 Construction tools: material tray, palette knife, masking paper, short-hair roller, seaweed cotton roller, brush, seaweed cotton, etc.
Construction process: ①On the putty layer, roll the primer once to penetrate and seal, and wait until it is completely dry;
②Roll the first eggshell finish, and wait until it is completely dry;
Eggshell finish needs to be colored, and the materials need to be mixed evenly. When applying, it is advisable to apply from the upper part to the lower part of the wall, from left to right, from inside to outside, from easy to difficult, and evenly apply the slurry to the wall with a roller or spray gun. The force should be uniform and no coating should be missed; After the primer is applied, the wall needs to be patched, and the primer must be applied after the patch is polished and smoothed; After the primer is applied over a large area, the corners of the wall must be painted in place, and the coating surface must be allowed to dry, dry to the touch, and not sticky to the fingers before the topcoat can be applied.
③Roll the second eggshell finish, and wait until it is completely dry;
④Use seaweed sponge to apply 1 pearlescent fantasy (fantasy silver), and wait until it is completely dry;
⑤Use seaweed sponge to apply 1 pearlescent fantasy (fantasy gold)
Construction environment: It is not suitable to construct when the temperature is lower than 5℃ or the relative humidity is above 80%.
Base treatment: Before construction, clean the surface of the base to be painted to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new base surfaces such as ash sand, plaster, cement, etc. (pH value is lower than 10, moisture content is lower than 10%) should be dried before construction.
During construction, please configure necessary protective and labor protection supplies such as protective glasses, gloves and professional construction clothes according to local operating specifications.
Before construction, stir well and use in a certain proportion. The preparation container must be clean and free of other chemical substances.
Please use clean water to clean the equipment in time during and after construction.

Specification


Solvent type Water-based
Theoretical coverage 6-30㎡/1KG/2 times
Dilution ratio Can be diluted with no more than 20% of clean water
Drying time Surface drying time ≤2h
Maintenance time 7 days/25℃, extended at low temperatue (not less than 5℃)
Implementation standard GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings"
Product specification 5KG/barrel
Shelf life 24 months
Storage Store in a sealed, cool and dry place at 5℃~35℃, prevent frost and avoid sunlight.
Construction methods Spot coating;Roller painting
Formaldehyde purify ratio ≥90%
Antibacterial rate Antibacterial rate of Escherichia coli and Staphylococcus aureus ≥99.9%