Brand Name: | Lantiden |
Model Number: | LNSA011 |
MOQ: | 100 barrels |
Price: | Negotiable |
Delivery Time: | 3-7 days |
Payment Terms: | T/T, L/C |
LNSA011 Ocean Heart Ultra Formaldehyde Purification Interior Wall Paints
Product Features
1. Deep formaldehyde removal: formaldehyde purification performance ≥90%.
2. Moisture-proof and mildew-proof: inhibit the growth of mold on the wall due to moisture.
3. Odor-free and environmentally friendly: no irritating odor, no formaldehyde, benzene, heavy metals and other harmful substances.
4. Scrub resistance: scrub resistance ≥1500 times.
5. High hiding power: cover fine cracks.
6. Simple construction: can be directly applied without mixing.
Product Use
Suitable for interior wall decoration of various buildings such as high-end residential buildings, apartments, hotels, office buildings, hospitals, schools, shopping malls, etc.
Technical Parameters
Theoretical dosage: about 3.5-4㎡/1kg/2 times depending on the specific process, the actual construction area will vary due to different personal construction techniques and processes.
Dilution ratio: 10%-15% of clean water can be used for dilution depending on the specific construction situation.
Drying time: Surface drying takes about 2 hours; recoating time is at least 2 hours (25℃, 50% relative humidity), and it can be extended moderately at low temperature.
Maintenance time: 7 days/25℃, which can be extended at low temperature (not less than 5℃) to obtain the ideal coating effect.
Implementation standards: GB18582-2020 "Limits of Hazardous Substances in Wall Coatings for Buildings", GB/T9756-2018 "Synthetic Resin Emulsion Interior Wall Coatings" first-class products.
Product specifications: 6KG/barrel.
Shelf life: See product label.
Usage method
Construction method: rolling, spraying, brushing, etc.
Construction tools: material tray, palette knife, masking paper, short-hair roller, brush, water-based spray gun, etc.
Construction process: ①On the putty layer, roll-coat one coat of anti-alkali sealing primer and wait until it is completely dry;
②Roll-coat the first coat of Ocean Heart Deep Formaldehyde-free Water-based Diatom Paint and wait until it is completely dry;
During construction, the corners of the wall must be painted first. When the corners are not completely dry, a large area of rolling is carried out. It is advisable to apply the slurry evenly to the wall from the upper part to the lower part of the wall, from left to right, from inside to outside, from easy to difficult, and use a roller or spray gun to apply the slurry evenly to the wall. The force should be uniform and no coating should be missed; the brushing speed should be consistent and the force should be uniform to ensure uniform coating. When rolling, it is strictly forbidden to squeeze the roller when the roller does not absorb much material; when brushing, the number of back and forth brushing should not be too many to prevent bubbling or leaving brush marks; normal rolling construction must be rolled and collected at the same time. When recycling, the roller must be collected in the same direction, and it is strictly forbidden to roll back and forth; rollers without dead angles should be selected for rolling. Try to stay close to the edge during construction; special areas such as corners, skirtings, and gypsum ceilings can be repaired with a brush for details.
③Roll the second coat of Ocean Heart Deep Formaldehyde-Free Water-Based Diatom Coating.
Construction environment: It is not suitable to apply when the temperature is below 5°C or the relative humidity is above 80%.
Base treatment: Clean the surface of the base to be painted before construction to ensure that the construction surface is clean, free of grease, floating dust, mold algae and other attachments; the construction surface must be flat and dry, without hollows, holes, protrusions, etc.; new gray sand, plaster, cement and other base surfaces (pH value below 10, moisture content below 10%) should be dried before construction.
During construction, please configure necessary protective and labor protection supplies such as protective glasses, gloves and professional construction clothes according to local operating specifications.
Before construction, it should be fully stirred and used in a certain proportion. The preparation container must be clean and free of other chemical substances and debris.
Please use clean water to clean the equipment in time during and after construction.
Precautions
If the product leaks, it can be covered with sand or soil for absorption.
For the treatment of pollutants after absorption, including cans and unused containers, they should be handled in accordance with local environmental protection standards.
Never discharge discarded paint waste into drains or water sources.
If this product accidentally enters your eyes when using it, please rinse with clean water in time. If you feel uncomfortable, please seek medical treatment in time.
In order to better protect the legitimate rights and interests of users, please do not purchase products with incomplete labels and beware of counterfeiting.
For any unclear points, please ask the local dealer for the product manual.