Lantiden Maigic Cystal Stone Series Texture Paint fast construction No Base Coat

Texture Wall Paint
November 05, 2025
Category Connection: Interior Wall Paint
Brief: Take a focused look at the specifications and what they mean in practice. This video demonstrates the application of Magic Crystal Stone textured powder paint, showing how its direct-to-wall formula eliminates the need for a skim coat. You'll see the fast, two-coat scraper method in action, learn how it resists peeling and humidity, and understand why it offers over 30% cost savings compared to traditional art paints.
Related Product Features:
  • Skim coat free application saves time, labor, and multiple construction steps.
  • Resists peeling, cracking, and dampness in humid climates while preventing alkali backflow.
  • Offers over 30% lower overall cost than traditional art paints with high coverage.
  • Simple two-coat scraper application method ideal for DIY projects and professional use.
  • Made from eco-friendly materials including diatomaceous earth with zero VOC and formaldehyde.
  • Provides excellent scrubbing resistance of over 6000 cycles for long-lasting durability.
  • Features high antibacterial rate of 99.9% against E. coli and Staphylococcus aureus.
  • Fast drying with surface drying time under 6 hours and 7-day full cure time.
FAQs:
  • Do I need to apply a skim coat before using Magic Crystal Stone?
    No, Magic Crystal Stone is designed for direct application to wall surfaces, eliminating the need for a skim coat and saving significant time and labor costs.
  • How much area does one bucket cover?
    A 20-kg bucket covers approximately 10 square meters when applied in two coats, providing excellent coverage efficiency for your projects.
  • Is this product suitable for humid environments like bathrooms?
    Yes, Magic Crystal Stone specifically resists dampness in humid climates and prevents issues like peeling and cracking, making it ideal for bathrooms and basements.
  • How long does it take for the paint to dry completely?
    The surface dries within 6 hours, with a full maintenance time of 7 days at 25°C (extended at lower temperatures but not below 5°C).
Related Videos

Lantiden coating production line

Company Introduction
December 17, 2025

Lantiden paint factory tour

Company Introduction
January 14, 2026

Welcome to visit Lantiden paint company

Company Introduction
January 14, 2026

Lantiden factory video

Company Introduction
July 29, 2025

Lantiden paint construction process

Interior Wall Paint
November 14, 2025

Lantiden CEO show you around paint factory

Company Introduction
November 05, 2025